Panasonic WJMP204 Instrucciones de operaciones Pagina 20

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 19
20
Joint metal
Remove 2 screws from
the rear beforehand.
Rack mounting
bracket (small)
Rack mounting
bracket (small)
Mount screw
Binding head
(M3x8)
Mount screw
Flat head (M3x6)
The installation described below should be made by quali-
fied service personnel or system installers.
Mounting in the Rack
Remove the four rubber feet by removing the four screws
from the bottom of the WJ-MP204.
Mounting One WJ-MP204 with the WV-
Q204/1
1. Fix the mounting brackets (large and small) on both
sides of the WJ-MP204 with the eight supplied screws
(M3x8).
Mounting two WJ-MP204s With the WV-
Q204/2
1. Place the joint metals on the WJ-MP204s as shown
below and fix them with the supplied screws (M3x6).
Note: Remove the two screws from the rear of each
WJ-MP204s and fasten it with the eight supplied
screws (M3x8).
2. Install the WJ-MP204s with the rack
mounting brackets on the rack using
four screws (not supplied).
Cautions:
Do not block the ventilation opening or slots in the
cover to prevent the appliance from overheating.
Always keep temperature in the rack within +45°C
(113°F).
Secure the rear of the appliance to the rack by using
additional mounting brackets (procured locally), if the
rack is subject to vibration.
Do not use tapping screws for installing the WJ-MP204
on the rack with the rack mounting brackets.
INSTALLATION
Rubber feet
Rack mounting
bracket (small)
Rack mounting
bracket (large)
Rack mounting screws
Vista de pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 30 31

Comentarios a estos manuales

Sin comentarios