Panasonic S18NKU-1 Manual de instalación

Busca en linea o descarga Manual de instalación para Acondicionadores de aire del sistema de división Panasonic S18NKU-1. Panasonic S18NKU-1 Installation Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
31
10. Installation Instruction
10.1 S9NKUW-1 S12NKUW-1
10.1.1 Select the Best Location
10.1.1.1 Indoor Unit
Do not install the unit in excessive oil fume area
such as kitchen, workshop and etc.
There should not be any heat source or steam
near the unit.
There should not be any obstacles blocking the air
circulation.
A place where air circulation in the room is good.
A place where drainage can be easily done.
A place where noise prevention is taken into
consideration.
Do not install the unit near a door way.
Ensure the spaces indicated by arrows from the
wall, ceiling, fence or other obstacles.
Recommended installation height for indoor unit
shall be at least 8.2 ft.
10.1.1.2 Outdoor Unit
If an awning is built over the unit to prevent direct
sunlight or rain, be careful that heat radiation from
the condenser is not obstructed.
There should not be any animal or plant which
could be affected by hot air discharged.
Keep the spaces indicated by arrows from wall,
ceiling, fence or other obstacles.
Do not place any obstacles which may cause a
short circuit of the discharged air.
If piping length is over the [piping length for
additional gas], additional refrigerant should be
added as shown in the table.
Example: For S9NKUW-1
If the unit is installed at 32.8 ft distance, the quantity of
additional refrigerant should be 1.64 oz .... (32.8 - 24.6)
ft x 0.2 oz/ft = 1.64 oz.
10.1.2 Indoor/Outdoor Unit Installation
Diagram
Vista de pagina 0
1 2 3 4 5 6 ... 15 16

Indice de contenidos

Pagina 1 - 10. Installation Instruction

31 10. Installation Instruction 10.1 S9NKUW-1 S12NKUW-1 10.1.1 Select the Best Location 10.1.1.1 Indoor Unit • Do not install the unit in excessiv

Pagina 2 - 10.1.3 Indoor Unit

40 10.2.3 Indoor Unit 10.2.3.1 How to Fix Installation Plate The mounting wall must be strong and solid enough to prevent if from the vibration.

Pagina 3

41 10.2.3.3 Indoor Unit Installation 10.2.3.4 For the right rear piping 10.2.3.5 For the right bottom piping 10.2.3.6 For the embedded piping

Pagina 4

42 10.2.3.7 Connect the Cable to the Indoor Unit 1. The inside and outside connecting cable can be connected without removing the front grille. 2

Pagina 5

43 10.2.3.8 Wire Stripping and connecting requirement 10.2.3.9 Cutting and flaring the piping 1 Please cut using pipe cutter and then remove the

Pagina 6

44 10.2.4 Outdoor Unit 10.2.4.1 Install the Outdoor Unit • After selecting the best location, start installation to Indoor/Outdoor Unit Installation

Pagina 7

45 10.2.4.3 Evacuation of the equipment When installing an air conditioner, be sure to evacuate the air inside the indoor unit and pipes in the follo

Pagina 8 - 10.1.4.5 Piping Insulation

46 9. Secure the wire onto the control board with the holder (clamper). 10. After completing wiring connections, reattach the particular plate and

Pagina 9 - 10.2 S18NKU-1 S22NKU-1

32 10.1.3 Indoor Unit 10.1.3.1 How to Fix Installation Plate The mounting wall shall be strong and solid enough to prevent if from the vibration.

Pagina 10 - Install a Sleeve of Piping

33 10.1.3.3 Indoor Unit Installation 10.1.3.4 For the right rear piping 10.1.3.5 For the right bottom piping 10.1.3.6 For the embedded piping

Pagina 11

34 10.1.3.7 Connect the Cable to the Indoor Unit 1. The inside and outside connecting cable can be connected without removing the front grille. 2

Pagina 12

35 10.1.3.8 Wire Stripping and connecting requirement 10.1.3.9 Cutting and flaring the piping 1 Please cut using pipe cutter and then remove the

Pagina 13

36 10.1.4 Outdoor Unit 10.1.4.1 Install the Outdoor Unit • After selecting the best location, start installation to Indoor/Outdoor Unit Installation

Pagina 14

37 10.1.4.2.4 Gas leak checking Pressure test to system to 400 PSIG with dry nitrogen, in stages. Thoroughly leak check the system. If the pressure h

Pagina 15 - with a torque wrench

38 9. Secure the wire onto the control board with the holder (clamper). 10. After completing wiring connections, reattach the control board cover (

Pagina 16 - 10.2.4.5 Piping Insulation

39 10.2 S18NKU-1 S22NKU-1 10.2.1 Select the Best Location 10.2.1.1 Indoor Unit • Do not install the unit in excessive oil fume areas such as kitch

Comentarios a estos manuales

Sin comentarios