Panasonic CU-3E19RBU-5 Manual de instalación Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
30
9.2 CU-4E24RBU
9.2.1 Check Points
Allowable
elevation:
15 m (49.2 ft) max.
elevation between
The allowable
each of the indoor
units and between
the indoor and
outdoor units.
Flexible cord x 4 core
(polychloroprene sheathed)
(Not included in the unit)
(Not included in the unit)
(Not included in the unit)
Unit B
Unit C
Unit D
Unit A
Applicable connecting tube kit:
CZ-3F type
Unit A Maximum pipe length: 25 m (82.0 ft)
Unit B Maximum pipe length: 25 m (82.0 ft)
Unit C Maximum pipe length: 25 m (82.0 ft)
Unit D Maximum pipe length: 25 m (82.0 ft)
Indoor/outdoor unit
connection cables
Flexible cord x 4 core
(polychloroprene sheathed)
(Not included in the unit)
Flexible cord x 4 core
(polychloroprene sheathed)
Outdoor unit power supply:
Single-phase 208-230V, 60Hz
45A switch
(circuit breaker)
(Not included in the unit)
Flexible cord x 3 core
(Not included in the unit)
Outside
wiring work
Grounding work
Total maximum pipe length: 70 m (229.6 ft)
Air purging: Air purging by vacuum pump.
Vista de pagina 3
1 2 3 4 5 6 7 8 9 ... 13 14

Comentarios a estos manuales

Sin comentarios